LodeIron Motor Co., LLC Ruidoso, New Mexico, USA Est. 2026

Quality and traceability

Every motor is an individual, and we treat it like one.

A specification published on a website describes a design. What you bought is one specific motor, built on one specific day, from one specific lot of steel and magnet and wire. We measure that motor, record what we measured, and tie it to a serial number you can read off the part for as long as the part exists.

How it works

Scan the motor. The records come up.

No paperwork to lose, no envelope taped to a box, no sticker that dissolves the first time it meets isopropyl. The serial and its scan code are laser marked into the bell. Point a phone at the code and you land on that motor's record. Or type the serial into the lookup page and get the same thing.

Photo 08 · The scan Phone held over the bell, scan code visible,
record showing on screen.
Square, 1600px.

Fig. 1  Serial lookup by scan

01

Dynamometer record

Your motor on our bench, on the propeller we recommend for that wind. Thrust, current, RPM, electrical power, efficiency, and winding temperature rise across the working range. If your unit came in under the family average, the record says so instead of rounding it away.

Thrust · Current · RPM · Efficiency · Temp rise
02

Balance record

Vibration is what eats bearings, blurs footage, and makes a flight controller fight the airframe instead of flying it. Every rotor is dynamically balanced and the measured residual unbalance is recorded in g.mm against your serial, before and after correction. A number you can compare beats the phrase "precision balanced" every time.

Residual unbalance, measured, per serial
03

Electrical record

Phase resistance and the balance between phases, measured KV, no load current, and continuity from phase to case. These are the numbers that tell you whether a motor was built right, and they are the first things anyone asks for when a build behaves strangely.

Resistance · KV · No load current
04

Material traceability

Your serial ties to the lot of steel, the lot of magnet, the spool of wire, the bearing lot, and the heat of aluminum, plus the build date and who built it. If a problem ever surfaces in the field, we can tell you exactly what else shares that history and how far it reaches. That is the difference between a recall and a phone call.

Lot · Heat · Date · Operator
05

Downloadable and yours to keep

Every record page has a signed PDF you can download and file in your own quality system, which is what your auditor is going to want anyway. We are not the only copy of your documentation, and you are not dependent on us being around in ten years to prove what you bought.

Signed PDF · Download and archive
06

Printed certificate on the federal line

Defense and aerospace purchase orders routinely require a certificate of conformance to arrive with the shipment, and receiving inspection will hold parts that show up without one. Federal line orders ship with a printed, signed certificate in the box in addition to the online record. Commercial line orders can have one on request.

Federal line · Printed C of C in the box

What a certificate says

Boring on purpose. That is the point.

A certificate of conformance is one page stating that the item was built to the released drawing at a stated revision, inspected, and accepted, signed by the person who accepted it. Quality departments ask for this on nearly every purchase order. Almost nobody selling motors in this size class can produce one.

SectionWhat it containsWhy it is there
IdentificationPart number, drawing and revision, serial, quantity, purchase orderTies the paper to the part and to your order
ConformanceStatement of build to drawing, inspection, and acceptanceThe clause your purchasing terms are asking for
Inspection summaryDimensional, electrical, balance, dynamometer, workmanshipShows what was actually checked, not just claimed
TraceabilitySupplier, lot or heat, and origin for each major componentLets you answer where it came from without calling us
Origin statementCountry of origin and where the work was performedThe question every program office asks first
AcceptancePrinted name, title, signature, dateA person put their name on it

Certificates reference the released drawing revision in effect at the time of build. If a drawing revision changes what you receive in a material way, we tell you before we ship, not after.

A note on published numbers

We publish measurements, not marketing.

Thrust and efficiency depend enormously on propeller, pack voltage, air density, and temperature. A single headline thrust number tells you almost nothing useful, and the industry habit of publishing the best result from the best sample on the best day is how buyers end up disappointed.

So we publish per serial, we state the propeller and the conditions, and we do not average away the units that came in low. Where we quote a range for the family, it is a range, and your unit's actual numbers are on its record.